Honda Charge Station EV, Burlingame CA, Fast Charging at home

Honda Charge Station EV, Burlingame CA, Fast Charging at home

Owens Electric & Solar recently completed a clean and code-compliant 50 amp dedicated circuit installation for a new Honda EV charger at a home in Burlingame.

Project Overview

This installation involved:

Installing a 50A, 240V dedicated branch circuit

Tapping from the existing 200 amp garage sub-panel

Installing a properly sized 2-pole breaker

Running appropriately sized conductors for continuous EV load

Securing and mounting the new Honda EV charging unit

Verifying voltage, torque specs, and proper operation

Why a Dedicated 50 Amp Circuit?

EV chargers are considered continuous loads under the National Electrical Code (NEC Article 625). A 50 amp circuit allows for:

Reliable Level 2 charging

Faster charge times

Reduced voltage drop

Proper thermal performance of conductors and terminations

Compliance with 125% continuous load calculation requirements

For a 50A breaker, this typically supports up to a 40A continuous charging load, depending on the charger’s rating.

Power Source: 200 Amp Garage Sub-Panel

Because the home already had a 200 amp sub-panel in the garage, we were able to efficiently tap power from that distribution point rather than running new feeders from the main service. Before installation, we:

Verified available capacity

Confirmed proper grounding and bonding

Ensured breaker space availability

Checked panel condition and labeling

This approach keeps the installation streamlined while maintaining safety and code compliance.

Clean, Professional Installation

As with all Owens Electric & Solar projects, this installation included:

Proper conductor sizing

Secure conduit routing

Clean panel work

Clear labeling

Functional testing under load

Our goal is always to deliver installations that are not just functional, but built for long-term reliability.

If you're installing a new EV charger in Burlingame or the surrounding San Mateo County area, Owens Electric & Solar can evaluate your panel capacity and design the right solution — whether it’s a simple dedicated circuit or a full service upgrade.

Owens Electric & Solar

Serving Burlingame and the Peninsula since 1964

Lic. #464389

Service provided: EV Charger Installation

Location: Burlingame, CA

Project Image Gallery

Products Used: Honda Charge Station 48